In the period from 2015 to 2019, OOO GrandEkspertInzhenering developed sets of design and working documentation for the following large enterprises:
№ p/p |
Name of company |
Name of work performed |
1 |
OAO IPP |
Development of the project documentation for the object: “Technical re-equipment of the trestle rack No. 1 DT railway inv. No. 701 OAO IPP in Novorossiysk, at the address: Novorossiysk, ul. Backbone, 4. |
2 |
OOO EvroKhim-BMU |
Development of the project documentation for the object: “Reconstruction of the EPI shop at OOO EvroKhim-BMU. Support during the passage of the GGE project documentation and the results of engineering surveys. |
3 |
OOO EvroKhim-BMU |
Development of design and working documentation of the object: “Drinking and fire-fighting water supply OOO EvroKhim-BMU. |
4 |
OAO IPP |
Development of design and working documentation of the object: "Technical re-equipment of the technological pipeline under KAS". |
5 |
OOO Gamma |
Development of project documentation of the object: "Construction of a warehouse for storage and transshipment of petroleum products OOO Gamma |
6 |
OOO RN-Tuapsinskiy NPZ |
Execution of design and survey works on the project: “MCC” Phase II (tit.930-01). Site for commercial accounting of LPG Stage №1. PD "MCC" Phase II (tit.930-01) ". Site for commercial accounting of LPG. |
7 |
OOO Gazprom dobycha Krasnodar |
Development of project documentation for the facility: Well number 2 of the East-Coastal deposit of the East-Coastal deposit inv. № 330644 |
8 |
OOO RN-Tuapsinskiy NPZ |
Execution of design and survey works on the object: “ELOU-AVT-12. Technical re-equipment. Modernization of the heat exchange system. |
№ p/p |
Name of company |
Name of work performed |
1 |
OOO LUKOYL-Yugnefteprodukt |
Development of documentation "Overhaul of the RVS-2000 reservoir. Replacing the pontoon. " |
2 |
PAO NK Rosneft', OOO RN-Tuapsinskiy NPZ |
Development of project documentation for the object: "Technical re-equipment of the crude oil fleet (tit.910-11)". |
3 |
ZAO KNPZ-KEN |
“AT-2. Technical re-equipment of technological equipment. Replacement of pumps N-7, N-18, located at the address: Krasnodar, ul. Zakharova, 2. |
4 |
OOO EvroKhim-BMU |
Development of the project “Construction of an economic workshop on the OOO EvroKhim-BMU territory in the city of Belorechensk, Krasnodar Region” |
5 |
OAO IPP |
"Technical re-equipment of the pumping station for pumping and draining fuel oil and diesel fuel for transshipment of bulk cargo at pier No. 4 OAO IPP. |
6 |
OOO EvroKhim-BMU |
“Development of the design and working documentation of the object:“ Compressor station OOO EvroKhim-BMU, Belorechensk ”. Development of design and working documentation for the installation of a block transformer substation at OOO EvroKhim-BMU |
№ p/p |
Name of company |
Name of work performed |
1 |
OOO Slavyansk ECO |
Development of the project documentation for the facility: “Reconstruction of installations MBU-2 / sk700 / 1; MBU-2 / sk700 / 2; AT-400/1; AT-400/2; base commodity; boiler room. |
2 |
ZAO KNPZ-KEN |
Design of the object: "Technical re-equipment of the mixing system in the RVS №24,26", located at the address: Krasnodar, ul. Zakharova, 2. " |
3 |
OOO Tuapsinskiy balkernyy terminal |
Feasibility study “Transfer of acetic acid to OOO “Port Mechel - Temryuk” port Temryuk” |
4 |
OOO Yugkhimterminal |
Development of design documentation OOO Yugkhimterminal: "Changing the range of goods. Methanol transshipment. The device unit filling the tanker ” |
5 |
АО RN-Rostovnefteprodukt |
Design and survey for the project: “Equipping tanks with stationary SI that meets the requirements of commercial accounting with the ability to transfer data to the AIS TPS at Likhovskoy, Salsk, Tsimlyansk, Millerovo petroleum depots.” |
6 |
OAO IPP |
Inspection of OAO IPP and PAO NMTP (pier No. 4, No. 5) for the possibility of transshipment of petrochemical and chemically hazardous substances located at: 353900, Novorossiysk, ul. Main, 4, and also PAO NMTP (wharf №4, №5) |
7 |
АО LVKP |
Development of documentation for the object: "West-Siberian complex for the deep processing of hydrocarbon raw materials (HCS) into polyolefins with a capacity of 2.0 million tons per year with the corresponding general plant facilities (OZH)" |
8 |
OOO IPP |
“Technical re-equipment of a pumping station for pumping and draining fuel oil and diesel fuel to drain light oil products from tank trucks. Expansion". |
№ p/p |
Name of company |
Name of work performed |
1 |
OOO IPP |
Design and working documentation OOO IPP on the object: "Handling of flammable liquids and base oils" |
2 |
OOO IPP |
Development and release of project documentation for the object “Construction of universal tanks for petroleum products” |
3 |
АО RN-Rostovnefteprodukt |
Design and survey work on the Millerovskaya tank farm. Technical re-equipment of the fuel tank filling system. FEAST" |
4 |
OOO НМТ |
Design work on the object: “Technical re-equipment of the tank farm site for the storage and transshipment of petroleum products OOO “NMT”. Refining products " |
5 |
OOO firma Temp |
Development of design documentation "Technical re-equipment of the tank farm site for the storage and transshipment of oil products OOO firma Temp |
6 |
OOO Gazprom dobycha Krasnodar |
Development of documentation for bringing the workplace on the automotive loading rack of the Gas Condensate Loading Station in Slavyansk-on-Kuban in accordance with the rules on labor protection when working at height, approved by order of the Ministry of Labor of Russia No. 155H of 09/05/2014 |
7 |
OOO GLASS TREYD+ |
Development of project documentation for the elimination of the hazardous production facility "Ammonia refrigeration unit" |
№ p/p |
Name of company |
Name of work performed |
1 |
OOO Yuzhno-Promyshlennaya Kompaniya |
Development of documentation “Technical re-equipment of RVS-1000, technical number 5 and steam supply systems for heating technological pipelines of OOO Yuzhno-Promyshlennaya Kompaniya |
2 |
OOO Slavyansk ECO |
Adjustment of the Project “Technical re-equipment of OOO Slavyansk ECO in terms of reduction to industrial safety requirements” to the actual compliance with the implemented solutions at the installation: MBU-2, SK-700/1, SK-700/2 and TSB |
3 |
OOO BTOF-Terminal |
Development of design documentation for the “Technical re-equipment of the warehouse site for the storage and transshipment of petroleum products to the sea transport OOO NTT |
4 |
OOO EvroKhim-BMU |
Development of design and working documentation for technical re-equipment of gas distribution and gas consumption OOO EvroKhim-BMU |
5 |
OOO U-SVL |
Project implementation: “Technical re-equipment of RVS No. 5 of the transshipment complex of oil products OOO U-SVL. |
6 |
PAO NMTP |
Design work on the object "The device warning system with increased energy efficiency of buildings and structures of Wide Pier № 1" |
7 |
OOO DELOVOY SOYUZ |
Development of working documentation for technical re-equipment for the introduction of commercial accounting systems when accepting light oil products from transport capacity measures received by rail from the Ivanovo and Paveletstsevsky oil depots of “Gazpromneft'-Terminal” JSC |
8 |
OOO EvroKhim-BMU |
Adjustment of the design and working documentation for the object “Economic workshop OOO EvroKhim-BMU |