In the period from 2015 to 2019, OOO GrandEkspertInzhenering developed sets of design and working documentation for the following large enterprises:

2015 year

№ p/p

Name of company

Name of work performed

1

OAO IPP

Development of the project documentation for the object: “Technical re-equipment of the trestle rack No. 1 DT railway inv. No. 701 OAO IPP in Novorossiysk, at the address: Novorossiysk, ul. Backbone, 4.

2

OOO EvroKhim-BMU

Development of the project documentation for the object: “Reconstruction of the EPI shop at OOO EvroKhim-BMU. Support during the passage of the GGE project documentation and the results of engineering surveys.

3

OOO EvroKhim-BMU

Development of design and working documentation of the object: “Drinking and fire-fighting water supply OOO EvroKhim-BMU.

4

OAO IPP

Development of design and working documentation of the object: "Technical re-equipment of the technological pipeline under KAS".

5

OOO Gamma

Development of project documentation of the object: "Construction of a warehouse for storage and transshipment of petroleum products OOO Gamma

6

OOO RN-Tuapsinskiy NPZ

Execution of design and survey works on the project: “MCC” Phase II (tit.930-01). Site for commercial accounting of LPG Stage №1. PD "MCC" Phase II (tit.930-01) ". Site for commercial accounting of LPG.

7

OOO Gazprom dobycha Krasnodar

Development of project documentation for the facility: Well number 2 of the East-Coastal deposit of the East-Coastal deposit inv. № 330644

8

OOO RN-Tuapsinskiy NPZ

Execution of design and survey works on the object: “ELOU-AVT-12. Technical re-equipment. Modernization of the heat exchange system.

2016 year

№ p/p

Name of company

Name of work performed

1

OOO LUKOYL-Yugnefteprodukt

Development of documentation "Overhaul of the RVS-2000 reservoir. Replacing the pontoon. "

2

PAO NK Rosneft', OOO RN-Tuapsinskiy NPZ

Development of project documentation for the object: "Technical re-equipment of the crude oil fleet (tit.910-11)".

3

ZAO KNPZ-KEN

“AT-2. Technical re-equipment of technological equipment. Replacement of pumps N-7, N-18, located at the address: Krasnodar, ul. Zakharova, 2.

4

OOO EvroKhim-BMU

Development of the project “Construction of an economic workshop on the OOO EvroKhim-BMU territory in the city of Belorechensk, Krasnodar Region”

5

OAO IPP

"Technical re-equipment of the pumping station for pumping and draining fuel oil and diesel fuel for transshipment of bulk cargo at pier No. 4 OAO IPP.

6

OOO EvroKhim-BMU

“Development of the design and working documentation of the object:“ Compressor station OOO EvroKhim-BMU, Belorechensk ”. Development of design and working documentation for the installation of a block transformer substation at OOO EvroKhim-BMU

2017 year

№ p/p

Name of company

Name of work performed

1

OOO Slavyansk ECO

Development of the project documentation for the facility: “Reconstruction of installations MBU-2 / sk700 / 1; MBU-2 / sk700 / 2; AT-400/1; AT-400/2; base commodity; boiler room.

2

ZAO KNPZ-KEN

Design of the object: "Technical re-equipment of the mixing system in the RVS №24,26", located at the address: Krasnodar, ul. Zakharova, 2. "

3

OOO Tuapsinskiy balkernyy terminal

Feasibility study “Transfer of acetic acid to OOO “Port Mechel - Temryuk” port Temryuk”

4

OOO Yugkhimterminal

Development of design documentation OOO Yugkhimterminal: "Changing the range of goods. Methanol transshipment. The device unit filling the tanker ”

5

АО RN-Rostovnefteprodukt

Design and survey for the project: “Equipping tanks with stationary SI that meets the requirements of commercial accounting with the ability to transfer data to the AIS TPS at Likhovskoy, Salsk, Tsimlyansk, Millerovo petroleum depots.”

6

OAO IPP

Inspection of OAO IPP and PAO NMTP (pier No. 4, No. 5) for the possibility of transshipment of petrochemical and chemically hazardous substances located at: 353900, Novorossiysk, ul. Main, 4, and also PAO NMTP (wharf №4, №5)

7

АО LVKP

Development of documentation for the object: "West-Siberian complex for the deep processing of hydrocarbon raw materials (HCS) into polyolefins with a capacity of 2.0 million tons per year with the corresponding general plant facilities (OZH)"

8

OOO IPP

“Technical re-equipment of a pumping station for pumping and draining fuel oil and diesel fuel to drain light oil products from tank trucks. Expansion".

2018 year

№ p/p

Name of company

Name of work performed

1

OOO IPP

Design and working documentation OOO IPP on the object: "Handling of flammable liquids and base oils"

2

OOO IPP

Development and release of project documentation for the object “Construction of universal tanks for petroleum products”

3

АО RN-Rostovnefteprodukt

Design and survey work on the Millerovskaya tank farm. Technical re-equipment of the fuel tank filling system. FEAST"

4

OOO НМТ

Design work on the object: “Technical re-equipment of the tank farm site for the storage and transshipment of petroleum products OOO “NMT”. Refining products "

5

OOO firma Temp

Development of design documentation "Technical re-equipment of the tank farm site for the storage and transshipment of oil products OOO firma Temp

6

OOO Gazprom dobycha Krasnodar

Development of documentation for bringing the workplace on the automotive loading rack of the Gas Condensate Loading Station in Slavyansk-on-Kuban in accordance with the rules on labor protection when working at height, approved by order of the Ministry of Labor of Russia No. 155H of 09/05/2014

7

OOO GLASS TREYD+

Development of project documentation for the elimination of the hazardous production facility "Ammonia refrigeration unit"

2019 year

№ p/p

Name of company

Name of work performed

1

OOO Yuzhno-Promyshlennaya Kompaniya

Development of documentation “Technical re-equipment of RVS-1000, technical number 5 and steam supply systems for heating technological pipelines of OOO Yuzhno-Promyshlennaya Kompaniya

2

OOO Slavyansk ECO

Adjustment of the Project “Technical re-equipment of OOO Slavyansk ECO in terms of reduction to industrial safety requirements” to the actual compliance with the implemented solutions at the installation: MBU-2, SK-700/1, SK-700/2 and TSB

3

OOO BTOF-Terminal

Development of design documentation for the “Technical re-equipment of the warehouse site for the storage and transshipment of petroleum products to the sea transport OOO NTT

4

OOO EvroKhim-BMU

Development of design and working documentation for technical re-equipment of gas distribution and gas consumption OOO EvroKhim-BMU

5

OOO U-SVL

Project implementation: “Technical re-equipment of RVS No. 5 of the transshipment complex of oil products OOO U-SVL.

6

PAO NMTP

Design work on the object "The device warning system with increased energy efficiency of buildings and structures of Wide Pier № 1"

7

OOO DELOVOY SOYUZ

Development of working documentation for technical re-equipment for the introduction of commercial accounting systems when accepting light oil products from transport capacity measures received by rail from the Ivanovo and Paveletstsevsky oil depots of “Gazpromneft'-Terminal” JSC

8

OOO EvroKhim-BMU

Adjustment of the design and working documentation for the object “Economic workshop OOO EvroKhim-BMU